Lower Total Cost:

The total project cost is established during the initial stages of project development. Before a contract is signed, a Guaranteed Price is determined based on an agreed-to scope of work. The Owner is then fully protected against cost over-runs that may occur throughout the project duration.
Cost savings are generated through innovative design and competitive tendering of sub contracts. Proven and practical construction techniques that have been developed over the years of designing and constructing buildings are incorporated into the design. Value is guaranteed by competitively tendering the major portions of the work.
Design-Build traditionally has offered lower fees to cover design costs, overhead charges, and profit margin. Fees are substantially less than those charged in the traditional design and tender route.
The Fast-Track construction process permits an earlier completion date by overlapping design and construction schedules and pre-ordering the critical components. This results in earlier occupancy date, saving the Owner rental or interest charges, or resulting in earlier revenue streams.